Turnkey Cold Storage Construction Stages & Project Timeline
The 7 engineering milestones from CAD sizing and sub-floor preparation to vacuum dehydration and handover.
1. Engineering & Civil Sign-off
Thermal sizing, CAD drawings, and floor flatness verification.
2. Insulated Envelope & Door Erection
Vapor-tight joint sealing, camlock fastening, and heated door calibration.
3. Nitrogen-Purged Brazing, Pressure Test & Deep Vacuum
All copper lines are brazed under dry nitrogen purge, pressure-tested for 24h, and evacuated below 500 microns before refrigerant charging.
Frequently Asked Questions
Why is deep vacuuming below 500 microns critical during commissioning?
Residual moisture freezes at the expansion valve and forms acids in POE compressor oil, causing premature motor winding failure.
Request a Turnkey Cold Storage Engineering Quotation
Share your room dimensions, target temperature, and destination port or city. Our refrigeration engineers respond with detailed heat load calculations, CAD layout, and EXW/FOB/CIF pricing.
Direct Engineering Desk
Phone / WhatsApp: +90 506 689 45 82
E-mail: export@ruzgarcooling.com
HQ & Factory: Zafertepe Mah. 533 Sk. No:9/B Yağhaneler, Konak, 35250 İzmir, Turkey